Choosing Starter Vape Kit puff count with warranty card
We ship starter vape kits to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.
Published 08 November 2024 · VapeWholesaleHub · Reading time 6 min
How we structure a first order
This page is for importers who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
A practical starting order for importers is 120 units across two or three SKUs, not 120 units of one. That spreads the risk, gives your staff something to compare, and still hits the first price break.
We source starter vape kits from a small group of factories we have worked with for years. That means a specification can be held across repeat orders instead of being re-qualified from scratch every quarter. Consistency is a boring selling point and it is also the entire game.
How orders move from factory to shelf
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 25 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
If you dropship, we can label cartons to your format and omit our documentation from the outer box. It is a small operational detail that decides whether your customer sees a supplier or a partner.
The reorder is the real test
For private label accounts we hold the artwork files and the approval record. Rebranding a line eighteen months later is then a file update instead of a redesign.
Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.
- Seven-day defect reporting with replace-or-credit
- Specification locked in writing before production starts
- Reference sample retained from every batch
- Cartons drop-tested and pallet-counted for clean freight
- Consolidated or split shipping, quoted both ways
- Standing reorder schedule with a fixed cut-off
Merchandising a small range well
Staff knowledge converts better than any poster. If your team can explain the difference between two coils in one sentence, the step-up SKU sells itself.
Counter space is finite. Three well-chosen SKUs outsell nine crowded ones, and the empty space signals a curated range rather than a clearance table.
Specification summary
| Battery | 800 mAh |
| Pod capacity | 2.0 ml |
| Coil resistance | 1.2 ohm |
| Included | Device, 2 pods, cable |
| Charging | USB-C 5V/1A |
| Packaging | Blister pack |
| Minimum order | 50 units per SKU, mixed cartons allowed |
| Lead time | 18 working days after artwork approval |
The detail above is what we hold ourselves to on every shipment, including the small ones. It is also the list we will walk through with you before the first order.
Frequently asked
What documents come with a shipment?
Commercial invoice, packing list, and the certificate pack for your market: test reports, declaration of conformity and safety data sheets. We send scans before dispatch so your broker can pre-clear the file.
How long does production take?
Around 25 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz