Starter Vape Kit colourway: same-week samples
We work with importers who order between a few hundred and a few thousand units at a time, and we treat both ends the same way: a written specification, a sample you approve, and a production run that matches the sample.
Published 21 November 2024 · VapeWholesaleHub · Reading time 9 min
Presentation that earns the step-up
A starter vape kit programme only works when three numbers agree: your shelf price, your reorder cycle and your defect tolerance. Change one and the plan moves. We build assortments around those three and we say so up front rather than after the invoice.
Staff knowledge converts better than any poster. If your team can explain the difference between two coils in one sentence, the step-up SKU sells itself.
Photography matters for online listings. Shoot on a neutral background with the device at a slight angle, show the pack alongside the unit, and keep the same framing across the range so the grid reads as a family.
Getting the carton there intact
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 15 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.
Quality control, in plain terms
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.
- Batch codes traceable from carton back to production date
- Cartons drop-tested and pallet-counted for clean freight
- Private label files archived for future rebrands
- Specification locked in writing before production starts
- Artwork proof plus physical dummy for custom packaging
- Mixed SKU cartons to spread first-order risk
The reorder is the real test
For private label accounts we hold the artwork files and the approval record. Rebranding a line eighteen months later is then a file update instead of a redesign.
Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.
Specification summary
| Battery | 500 mAh |
| Pod capacity | 2.5 ml |
| Coil resistance | 1.0 ohm |
| Included | Device, pod, cable |
| Charging | USB-C 5V/1A |
| Packaging | Retail box |
| Minimum order | 300 units per SKU, mixed cartons allowed |
| Lead time | 22 working days after artwork approval |
None of this is complicated. It is just written down, which is more than most buyers get before they wire a deposit.
Frequently asked
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
How long does production take?
Around 15 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
What documents come with a shipment?
Commercial invoice, packing list, and the certificate pack for your market: test reports, declaration of conformity and safety data sheets. We send scans before dispatch so your broker can pre-clear the file.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz